The following measures should be taken to control the risk of cave-ins and other potential hazards associated with trenching operations, including.
By registered accordance with, Trenches 20 feet deep or greater require that the protective system be designed by registered engineer or be based on tabulated data prepared and or approved1926.652 and ..
All excavations should have safe access and egress, including ladders, steps, ramps, or other safe means of exit for employees working in trench excavations 4 feet or deeper..
Inspect trenches at the start of each shift..
Inspect trenches following rainstorm or other water intrusion..
The in this article shall not be construed or interpreted as providing legal or any other advice.
The information material does not amend the provisions of any policy issued by CompSource Mutual.
It's not representation that coverage does or does not exist for any particular claim or loss under any such policy.
Return to work program We have created return to work program that is designed to help return injured employees..
Monthly safety training agenda-Framing Click on the link to view the safety training agenda for the industry.
Read more