While the process of designing and building church can take years of planning, hard work and energy, the result is always worth it..
We are proud to have completed HVAC installations in new religious facilities, and retrofittings in historical churches to preserve their rich history and intricate design details.
Our completed projects range from the design-build of 680-ton mechanical system for church comprising six acres of heated and cooled space, to award-winning 80,000-square-foot facility, to filter changes at church.
No matter what the heating, cooling and ventilation needs of your facility are, Energy Air can get the job done and will be happy to help..
it's important for your facility's heating and cooling system to always be running smoothly efficiently.
Especially with children and older adults in attendance, AC failure within church can be more than inconvenience it can also be hazard.
Energy Air completed the mechanical design and installed HVAC system with 680 tons of cooling for this 290,000-square-foot facility comprised of two three-story buildings, main classroom building and rotunda connecting the three structures.
Energy Air won Eagle Award for Excellence Construction for HVAC installation of this 80,000-square-foot church.
We are proud to provide full range of HVAC services for religious facilities throughout Central Florida.
For more information about how we can help with the design and construction of your new system, or if you would like to learn how to save energy and operating costs with your existing system, contact us today..
Read more