Cave-ins from excavations are one of the leading causes of worker fatalities in the construction industry..
Heavy equipment should be kept away from the edges of the trench to prevent the wall from falling in due to the weight of the equipment or from the equipment falling in.
Spoil piles should be kept at least 2 from the edge of the trench, this step prevents the material from weighing down and resulting in wall collapse.
Call OKIE811 to locate underground utilities before the start of each job.
the atmosphere should be tested before entry and then continuously.
The excavation should be reinspected before the start of each shift.
They should be re-inspected following the presence of any rain or in the trench...
The information material does not amend the provisions of any policy issued by CompSource Mutual.
It's not representation that coverage does or does not exist for any particular claim or loss under any such policy.
Return to work program We have created return to work program that is designed to help return injured employees..
Read more